I can understand the feasibility and added value to strategic connections and transportation between East and West Arab states, and the tighter control on Gulf of Aqaba..
I wonder why the layout is not perpendicular on Sinai from Jazierat Tiran, to drop near the Airport, away from beaches, Tourist center and shorter to only 20 km instead of 50.. This would not only maintain the eco system, but also would have urban viability.. Cuting down the cost from $3bln to only 1..
In addition, which is interesting to know: Is any information available on why President Mubarak had earlier rejected the project..?
http://www.greenprophet.com/2012/03/bridge-to-connect-saudi-arabia-and-egypt/#comment-85005
No comments:
Post a Comment